
KUALA LUMPUR (June 3): Energy infrastructure and services provider Wasco Bhd (KL:WASCO) has officially launched a new fabrication yard in the United Arab Emirates (UAE) as part of its Middle East expansion plan.
The new facility, spanning 25,000 sq m with an annual production capacity of 10,000 tonnes, is designed to fabricate process modules, pre-assembled units and pre-assembled racks, as well as gas compressor packages, electrical substations and E-Houses for both onshore and offshore energy applications.
“Its strategic location near one of the world’s busiest ports enhances Wasco’s ability to execute high-volume modular projects with greater efficiency and speed,” the group said in a statement on Tuesday. The yard will be operated under Wasco’s energy services division, Wasco Energy.
The UAE facility adds to Wasco’s current network of fabrication and coating hubs including its existing operations in Batam (Indonesia), Telok Panglima Garang (Malaysia) and pipe coating plants in Qatar, Malaysia, the United Kingdom and Tanzania.
Wasco Energy provides end-to-end modular engineering solutions — from front-end engineering design to fabrication and final delivery.
“This expansion is not just about scaling capacity — it’s about positioning Wasco closer to our clients and the region’s dynamic energy ecosystem,” said Wasco Energy CEO Shan Karupiah in a statement.
“With this new UAE facility, we are better equipped to deliver high-quality, customised modular solutions with speed, precision and engineering depth,” he added.
At Tuesday’s market close, shares in Wasco slipped 2.5 sen or 2.67% to 91 sen, valuing the company at RM701.40 million. Year-to-date, the counter has declined by more than 12%.