KUALA LUMPUR (July 4): Sime Darby Property Bhd’s (KL:SIMEPROP) Elimina Ridge 1, comprising landed residential developments, has been 98% taken up following the launch of its first phase on May 25 and second phase on June 22, according to a press release on June 27.
Part of the larger City of Elmina township in Shah Alam, Elmina Ridge 1 spans about 31.7 acres. The first phase, comprising 122 superlink, cluster and semi-detached units with built-ups from 2,265 sq ft (square feet) to 3,237 sq ft, and selling price from RM1.17 million, has been fully sold. It has a gross development value (GDV) of RM201.7 million.
The second phase offers 106 superlink and semi-detached units with built-ups from 2,265 sq f to 3,237 sq ft, and selling price from RM1.16 million. This phase has a GDV of RM171.3 million.
The statement highlighted that homes at Elmina Ridge 1 will have a modern biophilic concept with an indoor skylight planting area, and will be equipped with sustainable features such as readily fitted solar panels and batteries, electric vehicle (EV) isolator point, as well as thermal roof insulation.
In the statement, Sime Darby Property chief operating officer Appollo Leong said the strong take-up rate is a testament to the company’s alignment with the ever-evolving needs of modern, eco-conscious homebuyers.
“We aim to offer lifestyles that are in harmony with nature and integrate modern comforts when developing townships. Our community in the City of Elmina will be able to enjoy a host of lifestyle amenities in the upcoming Elmina City Centre, designed as a vibrant hub, with an education hub and the Elmina Lakeside Mall at the heart of the township,” Leong added.
Elmina Lakeside Mall is expected to be open to the public in August, having already achieved 97% tenancy. Some tenants include Jaya Grocer, Harvey Norman and various food and beverage (F&B) tenants, such as Kenny Hills Bakers, Sushi Zanmai, Dolly Dim Sum, CHAGEE and Inside Scoop. Visitors of the mall will also have direct access to the township’s 35-acre urban park.
In addition, the township is also set to welcome several new education facilities in the coming years, with SK Denai Alam opening in 2025, SJK(C) Regent Elmina in 2026, Sekolah Menengah Akademik Chong Hwa in 2027, and SMK Denai Alam anticipated to be completed by 2028.
Elmina Ridge 1 is accessible via the Guthrie Corridor Expressway and proposed future connectivity to the Damansara–Shah Alam Elevated Expressway.